Floor cracks in the floor is the most critical element. Most of the floor maintenance costs are associated with some form of floor slit damage. Ground floor joints will inevitably lead to ground discontinuity, which may lead to vehicle damage to the floor in operation. Floor seam setting has two purposes:

First, the daily pouring of concrete boundaries (construction joints); the second is to reduce the floor when the risk of cracking (contraction joints and isolation details). Construction joints must be set up dowels, as the floor between the various parts of the load transfer device. The traditional way of setting up the dowels can not withstand the frequent rolling of the vehicle, so that the floor seam in 1 to 2 years on the damage and the need for overhaul. It is strongly recommended to use high-quality armored joints as the load transfer device, as the cost of permanent repair may be 3 to 4 times the cost of armoring. The technology can effectively protect the use of the site strength of the ground, to minimize the rate of damage to the ground, saving maintenance costs, substantially improve the use of the ground period.

For long-term durability, it is recommended that the maximum distance between the joints be set to 40 to 50 m. Seams are set up to allow construction interruption and to account for shrinkage during concrete hardening for up to 2 years. The installed armor seam is mainly set in the warehouse unloading platform edge and fire shutter doors below the forklift passage more frequent parts.

Sub - warehouse template project


Sub - warehouse template project


Prev:NoNext:No
Products / Recommended products More
Add: No. 1428, Putuo District South Road, Shanghai, building 9, 304A
Tel:021-56531386 
Fax:021-56531578
Code:200331
Copyright ©2005 - 2013 Shanghai Mai Road Building Materials Co Ltd. ALL RIGHTS RESERVED
犀牛云提供企业云服务